Rainbow Leisure Centre
Dec 2018
The purpose of this project was to replace the existing boiler controls with a new panel for the new boiler installation, the aim was to control the temperature for the primary heating circuit to the leisure centre’s HVAC plant.
The control panel also included the facility to be accessed from anywhere using any device with a web browser. It also sends E-mail alerts for critical system faults.
Endsleigh Centre
Dec 2018
This project was part of a Multi Million pound project to convert the old Ensleigh Convent into living accommodation. We designed and installed a new heating control panel to suit the buildings new purpose.
Goole Fire Station
Oct 2018
This project was part of our ongoing upgrade to the Humberside Fire & Rescue building management scheme. The existing heating controls were replaced with a new fully integrated Web controller (Honeywell Hawk), to be accessed from a BMS front end PC located at the main Headquarters. The system is fully automated and is linked to the Fire service call out system enabling the station to be ready for use with heating and hot water. This project is one of many we have already implanted as part of the ongoing modernisation of the Fire Service.
Tedder Hall
Oct 2018
This project was part of a heating refurbishment. We worked alongside the main consultants to achieve the client’s exact criteria. We designed and built a control panel fully networked to be accessed by East Lindsey Council clerks. We delivered on time to a challenging time schedule.
Burlington Primary School (Bridlington)
Aug 2018
This was one of our many school boiler house refurbishments, working alongside a Mechanical contractor and in conjunction with the East Riding of Yorkshire Council. We manufactured and installed a new heating control panel to the specification brief.